PROJECTS

PRESIDENCY PROJECT

HECCL executed 2-No specialist project for the Presidency becoming in HISTORY, The first company to design and install small distribution rated transformer 1600KVA 11/0.415KV 50Hz with auto tap changing rationale. This transformer was manufactured by SIEMENS AUSTRIA. Additionally, we installed and commissioned Emerson UPS with over six hours back up time with load rated for 50KVA .

 

EMUHUN VILLLAGE ELECTRIFICATION USING SOLAR ENERGY

Despite the fact that Nigerian has hefty deposit of oil and other natural resources, available statistical information has indicated that over Seventy-five (75) Million citizens have no access to electricity, this phenomenon may trudge, clump, or lumber for the next 50 years if the government fails to consume our large base renewable energy resources clamoring for applicability.

Gleefully the price of renewable energy specifically Solar is constantly being plummeting to level rivaling that of conventional power generation.

SUBSTATION CONTRACT

Havilahtrend wins 10MVA (2x5MVA) 33/11Kv substation contract from HFP Engineering Nig Limited.

LV Projects

Past Trainings

HECCL has conducted several trainings both at its offices as well as clients’ offices on many different areas. Here are a few of such.

MV PROJECTS